Chandigarh, November 20 — In a major and welcome development for residents and employees of the Electricity Department in Ambala Cantonment, a new and modern office building for Sub-Division No. 2 of the Uttar Haryana Bijli Vitran Nigam (UHBVN), located on Bank Road, will soon be constructed. This has become possible through the sustained efforts of Haryana Energy Minister Shri Anil Vij.
The Energy Minister informed that administrative approval amounting to approximately Rs 3.75 crore has been granted for the construction of the new building. With the approval now in place, construction of the new office building at the existing site will begin shortly.
*Prompt and Positive Action on Employees’ Demand*
The HSEB Workers’ Union had recently met Energy Minister Anil Vij and sought the construction of a new building for Sub-Division No. 2. Taking serious note of the practical difficulties being faced by the employees and keeping public interest in view, the Minister acted promptly and positively on the demand, ensuring its fulfilment.
The new building will provide electricity consumers with a better environment for bill-related work, new connections, complaint redressal and other services. At the same time, departmental staff will get a safe and convenient workplace.
*Modern Building with Focus on Citizen Facilities: Anil Vij*
Energy Minister Anil Vij said that the proposed new building would be developed in a modern and impressive manner. It will include improved arrangements for staff seating, record maintenance and office functioning, along with adequate facilities for visiting consumers. The new building will have a boundary wall, main gate, tubewell, lift, parking area and other necessary arrangements. Reiterating his commitment, the Minister said that he remains fully dedicated to providing better civic facilities to the people of the area.
He added that once the new sub-division building is ready, residents will be relieved of the difficulties they currently face, while transparency and efficiency in departmental functioning will also improve.
*Shifting Due to 50-Year-Old Structure; Consumer Inconvenience to End*
It is worth mentioning that the structure of the old building housing Sub-Division No. 2 on Bank Road was more than 50 years old. In view of safety concerns and operational requirements, the office was temporarily shifted to a new building located at 12 Cross Road.
However, as the office was shifted some distance away from its earlier location, local electricity consumers were facing inconvenience in reaching it. Providing a permanent solution to this ground-level problem, Energy Minister Anil Vij has secured administrative approval of Rs 3.75 crore for the construction of a new building at the original Bank Road site itself.
*Important Step Towards Development and Convenient Services*
This step is being considered highly significant in the ongoing efforts to strengthen the electricity infrastructure in Ambala Cantonment. The construction of a new sub-division building equipped with modern facilities, in place of the dilapidated structure, will not only enhance the department’s efficiency but will also enable consumers, who have long awaited convenient access, to avail services at a nearby centre.With construction expected to gain momentum shortly, the electricity infrastructure of Ambala Cantonment is likely to receive renewed strength.
*New Machhonda Sub-Division to Be Inaugurated Soon: Anil Vij*
Energy Minister Anil Vij informed that a new Machhonda Sub-Division has been established to provide better facilities to electricity consumers, and its office is almost ready. It will be inaugurated in the coming days.
All areas falling towards Machhonda from the Ambala-Delhi railway line will now come under the jurisdiction of this new sub-division. With its establishment, thousands of electricity consumers in Machhonda, Chandrapuri, Sundarnagar, Shahpur, Shivala Mandi, Sai Ka Bagh, Gulab Mandi, Dudhla Mandi, Himmatpura, PNT Colony, village Bara and other nearby rural and urban areas will directly benefit.
Power Distribution Infrastructure Being Upgraded in Ambala Cantonment at a Cost of Rs 38 Crore Under RDSS*
It is pertinent to mention that, through the efforts of Energy Minister Anil Vij, work is underway to strengthen the electricity distribution system in Ambala Cantonment under the Revamped Distribution Sector Scheme (RDSS) at an estimated cost of approximately Rs 38 crore. Old wires, poles and transformers are being replaced under the project.
Energy Minister Anil Vij had inaugurated this project, which is expected to significantly improve power supply reliability and consumer services in the area.
......